
Case Study · Hospitality
The Monteverde Hotel
Corridor panels, bedside charging outlets and lounge floor boxes specified in brushed gold across guest rooms and public areas.
- Floors
- 12
- Guest rooms
- 246
- Rated cycles
- 100k
Floors
Guest rooms
Rated cycles

Residential
A finish-matched device schedule across 480 units — entrance panel to living room floor box, without a single visible compromise.
The Brief
The Approach
A single finish family — matte white plates with champagne gold detailing — applied to switches, outlets and floor boxes across every unit type.
Mock-up panels produced for three wall materials so the shadow gap could be reviewed under the project's actual lighting temperature.
Stock held against the full turnover schedule so late phases matched the show unit exactly.
Outcome
Turnover completed across three phases with no visible finish drift between the first show unit and the last delivered floor.
Units delivered
Turnover phases
Finish variances
Gallery
More work

Case Study · Hospitality
Corridor panels, bedside charging outlets and lounge floor boxes specified in brushed gold across guest rooms and public areas.
Floors
Guest rooms
Rated cycles

Case Study · Workspace
Motorised lift sockets, desk power strips and boardroom table modules coordinated for a headquarters floor plate.
Floors
Workstations
Table modules
Work with Grazen
Share the drawings and the finish palette — we will return a matched device schedule with technical data.