Grazen devices specified in a luxury architectural interior

Projects & Gallery

Where the last centimetre of the interior is Grazen.

Residences, hotels, restaurants, flagship retail and executive workspaces — specified device by device, finish by finish.

480+

Projects specified

24

Hotels & resorts

9

Cities

Portfolio

Selected work.

Filter by the kind of interior. Every project below was delivered with a finish-matched Grazen schedule.

Case Studies

Three projects, in detail.

The brief, the approach and what the finished interior delivered.

Aurelia Residences

Case Study · Residential

Aurelia Residences

A finish-matched device schedule across 480 units — entrance panel to living room floor box, without a single visible compromise.

Units delivered
480

Units delivered

Turnover phases
3

Turnover phases

Finish variances
0

Finish variances

Read the case study
The Monteverde Hotel

Case Study · Hospitality

The Monteverde Hotel

Corridor panels, bedside charging outlets and lounge floor boxes specified in brushed gold across guest rooms and public areas.

Floors
12

Floors

Guest rooms
246

Guest rooms

Rated cycles
100k

Rated cycles

Read the case study
Meridian Tower Workplace

Case Study · Workspace

Meridian Tower Workplace

Motorised lift sockets, desk power strips and boardroom table modules coordinated for a headquarters floor plate.

Floors
9

Floors

Workstations
620

Workstations

Table modules
38

Table modules

Read the case study
From mock-up panel to handover.

On site

From mock-up panel to handover.

How a Grazen finish schedule is developed with the design team and held through every phase of construction.

Gallery

Details, at full size.

Click any frame to open the gallery. Use the arrow keys to move between images.

Start a project

Have a project on the board?

Send us the drawings and finish palette. Our specification team will return a device schedule matched to the interior.